Services
Systems
Components
Projects

HG 1100 - Initial review

The Hanging Gardens methodology seeks to maximize cost saving opportunities while simultaneously retaining the architectural design intent of a project. We can do our best work when we are brought onto the project team in the initial design process with the owner and architect so we can help bring to life their vision while creating a cost-effective and functional system that mitigates stormwater. If a project seeks further dedication to sustainable efforts, LEED consultation is available to ensure clients have every option available to maximize achievable points in the rating system. The Initial Review of each project will provide an invaluable insight into a client’s stormwater mitigation potential, and an unparalleled opportunity to see how easy we make it to incorporate stormwater technology where one might not even expect it could be utilized.